ClampOn seized a contract from Stone Energy to supply multiple subsea sand monitors and pig detectors for the Stone Energy operated Cardona project. Deliveries are scheduled for Q1 2014.
Cardona is located in Mississippi Canyon block 29 in 2,296 FSW (700 MSW). Two wells will be drilled and tied-back to the Pompano platform. Production is slated to commence during late-2014.
More articles
-
18.11.2026 | Company | ProductSaudi Aramco 9COM approval for two ClampOn solutions
ClampOn has received Saudi Aramco 9COM numbers for its Corrosion Erosion Monitor and BIRD Wireless Leak Monitor, making both technologies available through Saudi Aramco's approved product registration system.
Article by Mohammed Alsuliman -
11.11.2026 | CompanyClampOn is certified to ISO 14001
ClampOn is now certified to ISO 14001 through DNV
-
27.10.2026 | Company | ProductClampOn BIRD Logger
The ClampOn BIRD Logger is designed for autonomous data collection where permanent monitoring infrastructure is not required.
-
27.10.2026 | Company | ProductWireless monitoring for brownfield facilities