05.07.2019
ClampOn has been awarded a contract for subsea CEM’s for permanent monitoring of pipe erosion from sand production. The CEM’s will be installed at a 6″ pipe bend on a subsea flow module, with direct interface with the SPS system. The module will be installed at approximately 200 meters depth on a subsea field in Norway.
Subsea CEM installed in a bend.
18.04.2023
Particle Monitoring for offshore wind project
Particle monitor will be installed at a wind farm offshore New York
14.03.2023
Corrosion and Erosion Monitoring
New contracts for corrosion and erosion monitoring
25.01.2023
New Patent for ClampOn Corrosion-Erosion Monitor
ClampOn has been granted a new patent