We know that every well is different and sometimes it will be necessary to reduce the production of oil and gas to keep sand production at an acceptable level. This could reduce overall production and hence profit. What we also see however, and where ClampOn support really pays off, is that a good understanding of every well will often open up the possibility to compensate for any lost production on one well by increasing production on other wells.
Below is an example of a customer's operating instructions to one of its fields. The instructions are the result of ClampOn's careful analysis of months of sand production data:
“To operations for the Amamba field, please operate your wells at the following gas rates to minimize sand production:- Well 1 Increase rate to 7.5 sm3/d, if possible.
- Well 3 Increase rate to a minimum FTHP of 115 bar.
- Well 7 Keep production as stable as possible at 6.5 sm3/d. If stable flow is not possible then reduce rate to 5.0 sm3/d.
- Well 11 Reduce maximum rate to 6.5 sm3/d and keep stable.
- Well 12 Reduce maximum rate to 5.5 sm3/d.”
More articles
-
18.11.2026 | Company | ProductSaudi Aramco 9COM approval for two ClampOn solutions
ClampOn has received Saudi Aramco 9COM numbers for its Corrosion Erosion Monitor and BIRD Wireless Leak Monitor, making both technologies available through Saudi Aramco's approved product registration system.
Article by Mohammed Alsuliman -
11.11.2026 | CompanyClampOn is certified to ISO 14001
ClampOn is now certified to ISO 14001 through DNV
-
27.10.2026 | Company | ProductClampOn BIRD Logger
The ClampOn BIRD Logger is designed for autonomous data collection where permanent monitoring infrastructure is not required.
-
27.10.2026 | Company | ProductWireless monitoring for brownfield facilities