The Laggan-Tormore project is located in North-West of Shetland and is operated by Total. The overall development concept consists of a long distance tie-back of subsea wells connected to a new gas processing terminal at Sullom Voe on Shetland, with further export of the processed gas to the UK Frigg pipeline system in the North Sea. The project scope for ClampOn includes nineteen (19) Sand, PIG and Vibration Monitors.
More articles
-
18.11.2026 | Company | ProductSaudi Aramco 9COM approval for two ClampOn solutions
ClampOn has received Saudi Aramco 9COM numbers for its Corrosion Erosion Monitor and BIRD Wireless Leak Monitor, making both technologies available through Saudi Aramco's approved product registration system.
Article by Mohammed Alsuliman -
11.11.2026 | CompanyClampOn is certified to ISO 14001
ClampOn is now certified to ISO 14001 through DNV
-
27.10.2026 | Company | ProductClampOn BIRD Logger
The ClampOn BIRD Logger is designed for autonomous data collection where permanent monitoring infrastructure is not required.
-
27.10.2026 | Company | ProductWireless monitoring for brownfield facilities